How to plan a whole-house refurbishment in St John’s Wood
A whole-house refurbishment brings layout, structure, services and finishes into the same programme. The decisions that prevent the most disruption are often made before the first room is stripped out. Begin with a brief that explains how you want to live in the house and a survey that explains what the building needs.

Set the brief and investigate the areas of uncertainty
Write down what the project needs to achieve at each level. That might include better daylight at lower-ground level, a calmer route from the entrance to the kitchen or a quieter top floor. Agree priorities before investing heavily in finishes. Ask the team to identify which ambitions depend on work elsewhere in the house.
Use the survey to decide which areas need more investigation. Concealed drains, patched floor structure and alterations made by previous owners can affect a new layout. Targeted inspections, where appropriate, help the design team give the contractor a clearer brief and explain which assumptions still need an allowance.
Build a cost plan that shows the decisions still open
Compare quotes against a shared scope. Check whether each one includes strip-out, structural work, services, joinery, final finishes and protection of retained fabric. Ask for the assumptions and provisional sums in writing, and note the information needed to make each item firmer. Two totals are hard to compare when one includes work the other leaves to a later stage.
Separate construction from professional fees, approvals, temporary accommodation and household purchases. Keep a contingency for the uncertainties the team can explain and agree a process for recording changes before the work is instructed.
Resolve structure and building services before finishes
Coordinate floor build-ups, ducts, drainage and plant access while there is room to make changes. A bathroom that moves across the plan can affect ceiling heights and pipe routes in the room below. A kitchen or joinery design may need power, ventilation and supports fixed much earlier than its installation date.
- Set dates for decisions on long-lead items such as glazing, joinery and stone.
- Agree which rooms or features need temporary protection during the build.
- Review samples in the light of the house before committing to a full installation.
Define handover at the beginning of the project
Agree who will check finishes, when systems will be commissioned and what information the household will receive. Set aside time for a walk-through, a record of outstanding items and instruction on the equipment. A clear handover plan makes completion easier to assess and gives the people living in the house a practical guide to looking after it.
Official guidance